Whittington Deck
Completed December 2009
After
Before
During
Previous slide
Next slide
This new deck was built to replace a wood deck that was in poor condition. The deck is built over a basement garage maintaining access to the garage with stairs from a mid level deck to the deck which is at the main floor level. It is constructed with treated wood framing, composite deck flooring and composite railing. On this deck we choose to use Latitudes brand composite 1×6 flooring with concealed fasteners, 4×4 post sleeves, 2×4/1×6 railing with 2×2 balusters purchased from Home Lumber Co in Winfield Ks.
Copyright © 2024 Timber Creek Construction L.L.C | Designed by Custom Internet Services LLC